Home |
IMPORTANT: | The following applies to the IBM 5160, not the 5150. |
Scope : | Tests switches 1,2,5,6,7,8 fully, and partially tests switches 3 and 4 |
RAM required : | At least 1 bank of motherboard RAM |
Note : | Once the 5160 has been powered on, no step will result in either switch 3 or 4 being changed. |
Scope : | Tests switches 3 and 4 |
RAM required : | At least 1 bank of motherboard RAM |
Note : | The program entered is different to the one in the first test. |